For reliable operation it is important to ensure that the way the operator is
secured to the wall takes into account the strength of the pillar, the size of the
gate, and how frequently the gate will be used:
Strength of the Pillar
High-security Kit together with a Wall
Adaptor Kit
This mounting is highly recommended for all
light-industrial gates, or for heavy gates of
any length.
Alternatively it should be considered for use
on pillars of low or unknown strength.
Pillar
FIGURE 7
Operator
V400
150mm
150mm 145mm
V500 210mm
Wall (minimum) Pillar (maximum)
Gate opening 110°
Pillar
(maximum)
Gate opening
110°
Wall (minimum)
FIGURE 6
Wall adaptor
(high- security)
Wall
adaptor
plate
Tables are based on gates shorter than 2.5 metres
For gates 2.5 metres to 3.0 metres long, reduce the maximum pillar thickness by
20mm
For gates 3.0 metres to 3.5 metres long, reduce the maximum pillar thickness by
40mm
For gates 3.5 metres to 4.0 metres long, reduce the maximum pillar thickness by
60mm
The typical minimum wall clearance required to fit the operator
The maximum allowable pillar thickness on which to fit the operator
Best installation
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 81 82

Comments to this Manuals

No comments