Centurion VECTOR2 Installation Manual Page 3

  • Download
  • Add to my manuals
  • Print
  • Page
    / 82
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 2
Contents
page 1
page 2
page 2
page 3
Mechanical Setup
Electrical Setup
Commissioning and Handover
IMPORTANT SAFETY INSTRUCTIONS
1. Declaration of Conformity page 5
2. General Description page 6
Lightning Protection page 7
3. Icons Used in this Manual page 7
4. Specifications page 8
Physical Dimensions page 8
Technical Specifications page 9
Control Card page 10
Power Supply page 10
Power Supply, Control Box and Control Card Assembly 2 page 10
Allowable Gate Mass page 11
5. Product Identification page 12
6. Required Tools and Equipment page 14
7. Preparation of Site page 15
General Considerations for the Installation page 15
Strength of the Pillar page 16
Strength of the Gate and Gate Bracket page 19
Mechano Kit Installation Options page 20
High-Security Kit Installation Options page 21
8. Cabling Requirements page 22
9. Critical Installation Checklist page 23
10. Operator Installation page 24
Determine the Gate Bracket Position page 25
Fasten Gate Bracket to Gate page 27
Adjust Origin Clamp page 28
Inward Swing Gate Setup page 29
Outward Swing Gate Setup page 32
11. Determine Gate Swing Angle page 35
12. Allowable Wind Load page 36
Page view 2
1 2 3 4 5 6 7 8 ... 81 82

Comments to this Manuals

No comments